15' Benchmark TTC S-Curve Conveyor

15' Benchmark TTC S-Curve Conveyor
Description
Needs an 8″ wide modular belt. Conveyor height: 34½” Length of conveyor: 15′ or 180″ Comes with adjustable guide rails and a 1 HP Baldor Industrial Motor.
Specifications
| Manufacturer | Benchmark Automation |
| Model | TTC 7.5-504 |
| Year | 2001 |
| Condition | Used |
| Stock Number | 2221 C5 |
| Power | 208 V | 30 A | 60 Hz | 3 Ph |









